Solution Overview

•6 tasks
–Preparation of integration test scenarios
    •Analysis of components developed during the project (interfaces)
    •Test cases plan => detailed high-coverage
 
–Integration of modules/components into the PoC demo system
    •Integration step between the different modules/components of the ADAX system
 
–Integration tests
    •Tests performed at the system level
 
–Setup of demonstration testbed
    •Testbed
    •Deployment requirements, procedures, and scripts for the replication of the demo environment & system
 
–Development of demonstration scenarios
    •Based on use cases
    •Preparation of the technical steps of scenarios (attack, countermeasure, simulation)
 
–Demonstrations to interested stakeholders
    •Individual demonstrations during the project
    •Final demonstration(s) to reviewers
    •Ensure that demonstrations remain feasible after the project for commercial and public exploitation